AERIAL CONSTRUCTION
Code Description Unit of Measure
200 Place pole 25' to 55' ea.
204 Remove pole or push brace any size- Includes pulling the pole, filling and tamping the hole. Hauling the pole to a pole/yard pile in the vicinity. It also includes removal of all hardware and stenciling on old pole. ea.
211 Place anchor all locations - includes hauling anchor to job site and all required work to properly install anchor in correct position and proper depth. Includes screw/expanding type anchors ea.
212 Remove anchor and rod - Removal of the anchor/rod out of the ground, all restoration as required, and haul anchor/rod to designated storage area ea.
220 Place/remove guy (all types and all sizes) - Includes the hauling of all required materials and associated hardware, boring any necessary holes, placing and removing bolts and making up/removing or re-tensioning guy. (this includes guy guard, span guys, sidewalk guys, overhead guys and down guys) ea.
222 Transfer drop - To transfer aerial wire from pole, crossarm, building or messenger and attach to another pole, crossarm, building or messenger strand. This will include any guards, cleats and associated hardware as required. ea.
223 Lower/raise drop - Lower or raise drop on any pole or building as required by engineering work order ea.
230 Transfer strand/cable attachment without guy - single attachment ea.
231 Transfer strand/cable attachment with guy - single attachment ea.
232 Lower or raise strand/cable attachment without guy - single attachment ea.
233 Lower or raise strand/cable attachment with guy - single attachment ea.
234 Transfer buried riser - transfer buried riser cable on pole, includes cable guards ea.
250 Place strand (all sizes) per ft
251 Lash copper cable - 100 pr and less per ft
252 Lash copper cable - 101 pr up to 400 pr per ft
254 Lash fiber all sizes per ft
256 Remove strand/cable and fiber - this unit includes removal of strand and lashed facilities to that strand. It includes removal of all hardware from poles associated with the stripped facilities. Also returning all removed facilities back to the appropriate CCI facility per ft
257 Snow Shoes - Place individual snow shoe ea.
258 Snow Shoes - Place pair snow shoes to store fiber properly on strand per pr
260 Place self-support and flat drop cable….includes 12 fiber both flat and self support . Also includes both 6 pair and 12 pair copper drop per ft
261 Remove self-support drop cable….same definition as above per ft
264 Resag strand/cables when pulled down per ft
265 Delash and then relash a section when lashing wire has been broken (manager approval needed) per ft
BURIED CONSTRUCTION
Code Description Unit of Measure
347 Pull fiber in conduit per ft
353 Mandrel duct and install pull wire - This operation applies to mandrelling ducts at the request of the customer to determine the condition of the duct. per ft
HOURLY RATES
Code Description Unit of Measure
506 Hourly 2 person Linecrew with Line truck ( regular time) hourly
507 Hourly 2 person Linecrew with Line truck ( over time) hourly
508 Line technician (regular time) hourly
509 Line technician (overtime) hourly
512 MH Entry - to include test pump and ventilate as well as to provide tools equipment to safely enter and work in a manhole…..***If working the same MH consecutive days or nights then only 1 time can this be taken, not to be used for each crew when changing shifts ea.
517 Dump truck (single axle) hourly
519 Line truck with auger & boom hourly
521 Cable trailer (all sizes) hourly
523 Pole-sand trailer hourly
555 Bucket Truck hourly
Aerial CONSTRUCTION
Code Description Unit of Measure
201 Place pole 25' to 55' Off road-dirt ea.
202 Place push brace pole, any size ea.
203 Set pole in rock….Unit add-on for setting in rock ea.
205 Pole/relocation - Relocation is used when a pole is lifted and moved over by trenching/lifting the pole out of a present location and placing in a new hole at an adjacent location. Also included is setting the pole plumb or at the correct angle of rake, proper tamping, tagging and restoring the area to an orderly appearance. ea.
206 Straighten pole - This applies to existing poles only. Includes loosening the dirt around a pole, replumbing the pole, tamping and restoration to a neat appearance. ea.
209 Stencil pole when that is the only required step for that pole location - Means placing the required stenciling on existing poles to make it coincide with continuing property records. This includes removing old stencils when necessary to re-number a pole. Poles are to be numbered as required when set. This unit is only to be used if a no other work is to be performed at the pole and the EWO is calling to stencil a pole. ea.
213 Place rock bolt anchor ea.
221 Place ground rod - This unit includes hauling the ground rods to the work location and installing, either mechanically or manually, the total number of rods required to obtain the ground as indicated on the work drawing. Also includes cleat ground wire as needed. ea.
224 Place/remove extension arm - placement of cable extension arms to clear obstacles ea.
225 Attach cable to pole or building (Fiber and Cable) - This covers all work necessary to cleat cable, drop to walls, backboards, and riser poles according to Customer specifications. per ft
226 Place/Remove "U" cable guard - making sure cable or fiber is properly cleated up pole or building ea.
235 Transfer foreign utilities - This unit applies to transferring or swinging of foreign utilities (CATV etc.) only with prior approval ea.
236 Transfer or move PMT (Pole Mount Terminal) - when not transferring strand or cable at the same location ea.
240 Place large apparatus - Includes placement of large apparatus such as fiber FDH's, load coils, air dryers or cross connect boxes. Also covers hauling the apparatus and required mounting hardware from the storage location to the job site and properly mounting on pole or strand. ea.
241 Remove large apparatus - applies to removal of apparatus from pole or strand after it has been un-spliced from the cable and the hauling to a designated area. ea.
242 Transfer large apparatus - Includes placement/transfer of large apparatus such as fiber FDH's, load coils, air dryers or cross connect boxes. Also covers hauling the apparatus and required mounting hardware from the storage location to the job site and properly mounting on pole or strand. ea.
253 Lash copper cable - 401 pr and greater per ft
255 Place fiber marker tags - on existing route NOTE: UNIT 254 IS TO BE UTILIZED ON EXISTING ROUTES WHEN CALLED FOR ON EWO BY ENGINEERING. NEW CABLE PLACEMENT INCLUDES PLACEMENT OF MARKER TAGS. ea.
262 Place self supporting inner duct per ft
263 Remove self supporting cable/inner duct per ft
BURIED CONSTRUCTION
Code Description Unit of Measure
303 Machine trench to 24" per ft
304 Machine trench to 30" per ft
305 Machine trench to 36" per ft
306 Backhoe to 24" per ft
307 Backhoe for every foot over 24" per ft
308 Hand dig to 24" per ft
309 Hand dig for every foot over 24" per ft
312 Place cable/innerduct to 2" in trench dug by others per ft
313 Place cable/innerduct over 2" in trench dug by others per ft
314 Place additional cable/innerduct to 2" same time per ft
315 Place additional cable/innerduct over 2" same time per ft
316 Place up to 2" PVC in open trench (each) per ft
317 Place over 2" PVC in open trench (each) per ft
318 Slick bore - covers hauling the pipe to the job site, supplying and using all necessary tools and equipment, all required digging in connection with the operation and installing the pipe where required by pushing pipe per ft
325 Place ground rod and wire - this unit will cover hauling #6 ground wire & ground rod to the job site, burying by any method at the required depth, and placing ground wire & rod into the pedestal or cabinet. ea.
326 Install warning tape per ft
327 Backfill trench dug by others - Includes backfill of trench dug by others up to 3' deep and 6" wide. per ft
328 Place or remove pedestal 8"and smaller - includes hauling materials to the job site and the placing of any above ground fixtures used for enclosing or terminating buried or trenched cable. The work operation includes the placing of all parts of the fixture (mounting brackets, etc.) which are required at any one location, and also includes the feeding of cable properly into the fixture ea.
329 Place or remove pedestal over 8" - includes hauling materials to the job site and the placing of any above ground fixtures used for enclosing or terminating buried or trenched cable. The work operation includes the placing of all parts of the fixture (mounting brackets, etc.) which are required at any one location, and also includes the feeding of cable properly into the fixture ea.
330 Raise or lower pedestal 8" and smaller ea.
331 Raise or lower pedestal over 8" ea.
332 Place sign post and associated signs - This unit includes all labor and equipment associated with placing/removing cable warning posts and signs ea.
335 Place X-Conn box - Includes hauling cross-connect box to job site, placement of the box on the pad, cable stubs, and attachment of all anchor bolts to the mounting hardware ea.
341 Pull 100 pr or less in conduit per ft
342 Pull 101-400 pr in conduit per ft
343 Pull 401-900 pr in conduit per ft
344 Pull 901 pr and over in conduit per ft
345 Pull innerduct in conduit (each) per ft
346 Pull Maxcell in conduit (each) - Permission needed per ft
349 Place tracer wire - This unit to be used when NOT placing fiber optic cable. per ft
350 Remove underground cable up to 600pr - This covers all work operations necessary to remove cable from the duct systems between manholes or from direct buried duct and plugging the ducts after the cable has been removed. per ft
351 Remove underground cable over 601pr - This covers all work operations necessary to remove cable from the duct systems between manholes or from direct buried duct and plugging the ducts after the cable has been removed. per ft
352 Remove underground fiber cable - This covers all work operations necessary to remove cable from the duct systems between manholes or from direct buried duct and plugging the ducts after the cable has been removed. per ft
354 Remove innerduct - this covers all work operations necessary to remove innerduct from duct systems between manholes or from direct buried duct per ft
355 Place fiber handhole - this includes all equipment required for hauling the splice box/hand hole from the storage facility to the job site, all excavating and placement of the splice box/handhole at the required depth. Includes termination and sealing conduits, back filling the excavation and placing the proper amount of cover over the box when requested ea.
356 Place handhole up to 4x8x4 - this includes all equipment required for hauling the splice box/hand hole from the storage facility to the job site, all excavating and placement of the splice box/handhole at the required depth. Includes termination and sealing conduits, back filling the excavation and placing the proper amount of cover over the box when requested ea.
361 Core bore facility wall - This includes the furnishing of all equipment and labor necessary to core bore a hole through the concrete wall of a central office vault or manhole for the purpose of installing cable, load coil stubs, conduit, etc. ea.
HOURLY RATES
Code Description Unit of Measure
500 Equipment operator (regular time) hourly
501 Equipment operator (overtime) hourly
502 Foreman (regular time) hourly
503 Foreman (overtime) hourly
504 Laborer (regular time) hourly
505 Laborer (overtime) hourly
510 Splice Technician (regular time) hourly
511 Splice Technician (overtime) hourly
513 Pickup truck hourly
514 Combo truck - jack hammer, concrete chipping tools, hand tools generator and cords, MH set up including ventilation equipment and gas test meter, 800' - 1/2" fiberglass rodder, 400' - 1/4" fiberglass rodder, 2" water pump, vacuum, safety equipment including traffic control sign packages....***expect all trucks to come properly outfitted with all required to get the job done hourly
515 Truck (flat bed) hourly
516 Truck (2 ton & over) hourly
518 Dump truck (double axle) hourly
520 Semi-tractor w/low boy trailer hourly
522 Equipment trailer hourly
524 Front end loader hourly
525 Bulldozer w/static plow (any size) hourly
526 Trencher or cable plow (1-40 horsepower) hourly
527 Trencher or cable plow (over 40 horsepower) hourly
528 Air compressor - tow behind hourly
529 Vibrator tamper (compactor or wheeled) hourly
530 Vibrator tamper (hand-held) hourly
531 Tractor equipped with bushhog hourly
532 Water pump (centrifugal) hourly
533 Water pump (mud hog) hourly
534 Wheeled Road Saw hourly
535 Manhole blower hourly
536 Cut-Off Saw hourly
537 Portable generator hourly
538 Core Drill includes bit up to 4-1/4" hourly
539 Chain saw hourly
540 Concrete saw hourly
541 Asphalt roller hourly
542 Tree trimming truck hourly
543 Chipper hourly
544 Flasher barricades hourly
545 Roadway directional flashing signal hourly
546 Sm-Med Excavator up to 12K lb. hourly
547 Backhoe hourly
548 LRG Excavator over 12K lb. hourly
549 Trackhoe hourly
550 Track dozer (small) hourly
551 Grader hourly
552 Welder w/ truck and tools hourly
553 1000 watt light bank hourly
554 Trench Box hourly